Dubai Metro Train

Home › Lines

Dubai Metro Lines

The Dubai Metro has two lines in operation: the Red Line (35 stations, 67.1 km) along Sheikh Zayed Road, and the Green Line (20 stations, 22.5 km) through Deira and Bur Dubai. They meet at Union and BurJuman. The Blue Line opens in 2029.

Comparison

Red LineGreen LineBlue Line
StatusOperatingOperatingUnder construction
Length67.1 km22.5 km30 km
Stations352014
Opened9 Sep 20099 Sep 20119 Sep 2029 (planned)
TerminalsCentrepoint, Life Pharmacy, Expo 2020e&, CreekCreek, Centrepoint, Academic City
AirportTerminal 1 and Terminal 3NoNo

Ridership

Fully driverless. Held the Guinness World Record for longest driverless metro line 2009-2016 and again from 2021 until December 2024, when surpassed by Riyadh Metro.

Frequently asked questions

How many metro lines are there in Dubai?

Two lines are in operation, the Red Line and the Green Line. The Blue Line is under construction (opening planned for 9 September 2029) and a Gold Line has been announced for 2032.

Where do the Red and Green lines meet?

At Union and BurJuman stations.

How long is the Dubai Metro network?

89.6 km (nearly 90 km): the Red Line is 67.1 km and the Green Line 22.5 km.

Reviewed 1 October 2026.