Dubai Metro Train

Home › About the Dubai Metro

About the Dubai Metro

The Dubai Metro opened on 9 September 2009. Today it has two lines, 53 stations and 89.6 km (nearly 90 km) of track, runs fully driverless trains and carried 294.7 million passengers in 2025. It is operated under Dubai's Roads and Transport Authority (RTA).

Key figures

Network length89.6 km (nearly 90 km)
Red Line67.1 km, 35 stations, opened 09/09/2009
Green Line22.5 km, 20 stations, opened 09/09/2011
Passengers 2025294.7 million (+7% on 2024)
Passengers 2024275.4 million
Since openingMore than 2.4 billion; 99.7% punctuality
Busiest station 2025BurJuman, 17.8 million

Timeline

9 Sep 2009Red Line opens, the first urban metro in the Gulf region.
9 Sep 2011Green Line opens, with interchanges at Union and BurJuman.
8 Jul 2020Route 2020 opens: 15 km and 7 stations towards Expo 2020, with 50 new trains.
2025294.7 million Metro riders in 2025 (+7% vs 2024). Busiest stations 2025: BurJuman 17.8M, Al Rigga 13.8M, Union 13.6M, Mall of the Emirates 11.2M, Sharaf DG 10.5M.
9 Jun 2025Foundation stone of the Blue Line laid.
Jul 2026First phase of Blue Line tunnelling completed.
9 Sep 2029Blue Line opening (planned): the network grows to about 131 km and 78 stations.
9 Sep 2032Gold Line target date: 42 km and 18 stations.

Driverless trains

Fully driverless. Held the Guinness World Record for longest driverless metro line 2009-2016 and again from 2021 until December 2024, when surpassed by Riyadh Metro.

Station names and sponsorship

Many stations carry the name of a company that bought naming rights, which is why names like Rashidiya, Al Khail or Jebel Ali have disappeared from the map. Renamed stations: UAE Exchange -> Life Pharmacy; Al Khail -> Al Fardan Exchange; GGICO -> Al Garhoud; Jebel Ali -> National Paints; Nakheel Harbour & Tower -> Jebel Ali; Mashreq -> InsuranceMarket.ae; ONPASSIVE -> Garmin; Umm Al Sheif -> Equiti; Al Rashidiya -> Centrepoint; Al Jafiliya -> Max; Al Karama -> ADCB; Dubai Marina -> Sobha Realty; JLT -> DMCC; Palm Deira -> Gold Souq; Etisalat -> Etisalat by e&. The full history is on the renamed stations page.

Busiest stations

294.7 million Metro riders in 2025 (+7% vs 2024). Busiest stations 2025: BurJuman 17.8M, Al Rigga 13.8M, Union 13.6M, Mall of the Emirates 11.2M, Sharaf DG 10.5M.

Frequently asked questions

When did the Dubai Metro open?

The Red Line opened on 9 September 2009 and the Green Line on 9 September 2011.

How many people use the Dubai Metro?

294.7 million passengers in 2025, about 807,000 a day, and more than 2.4 billion since 2009.

Who runs the Dubai Metro?

The Roads and Transport Authority (RTA) of Dubai.

Reviewed 1 October 2026.